You are here

Case study Riga: Construction material exchange point

Edited on

21 March 2022
Read time: 1 minute

In this eighth case study delivered by the URGE network, Riga Energy Agency shares lessons learnt on their construction material exchange point. Started as a Small Scale Activity in the URGE project, plans are now in the making for a larger exchange point. The point is the first of its sort in Latvia and has gained much attention. 

Case study URGE